ROF Aalayas is Developing Affordable housing in Gurgaon in Sector 102, now ROF Group is launching ROF Aalayas Sector 102 Phase 2 Gurgaon, This project will be developed in 5.5 acres all 3 BHK units and on a very prime location which is bang on 60 meter wide road.
Ramada affordable housing in Gurgaon is situated on the Dwarka Expressway (150 Mtr Wide) has good connectivity with other areas of Gurgaon and Delhi/NCR.
ROF Aalayas Sector 102 Phase 2 Gurgaon
Location Advantage
- 15 min drive for International Airport T3
- 10 minutes for Sultanpur Bird Sanctuary
- Surrounded by Luxury Group Housing
- 400 Meters from Proposed Metro Station
- 5yrs Free Maintenance.
- 800 Acres Green Area opposite this site
Amenities
- Swimming Pool
- Central Green Zone
- Cycling Track
- Daily Needs Shop
- Fountains
- Jogging Track
- Kids Open Play Area
- Kite Flying Area
- Sitting Areas
- Gated Community
Specification
1 | Living/ Dining Flooring | Tiles |
2 | Bedrooms Flooring | Tiles |
3 | Wall Finish | Oil bound distemper |
4 | Toilets Wall Finish | Upto 5 feet tiles and Oil bund distemper in other area |
5 | Toilet Flooring | Tiles |
6 | Platform | Tiles |
7 | Wall Finish | Tiles upto 2 feet high above marble counter & Oil bound distemper in balance area |
8 | Others | Single bowl stainless sink |
9 | Balcony flooring | Tiles |
10 | Ceiling | Oil Based distemper |
11 | Window | Power coated/ anodized aluminium frame windows |
12 | Main Door | Painted hardwood frame door |
13 | Internal Door | Painted hardwood frame door |
14 | Chinaware | Modern and elegant |
15 | C. P. Fittings | Modern and elegant |
16 | Electrical | Use of ISI marked products for wirings, switches and circuits |
17 | Security | Gated Complex |
Payment Plan
TIME OF PAYMENT | PERCENTAGE OF THE TOTAL AMOUNT PAYBLE |
At the time of Application | 5% of Total Amount |
Within 15 days of issuance of allotment letter | 20% of Total Amount |
Within 6 months of issuance of allotment letter | 12.5% of Total Amount |
Within 12 months of issuance of allotment letter | 12.5% of Total Amount |
Within 18 months of issuance of allotment letter | 12.5% of Total Amount |
Within 24 months of issuance of allotment letter | 12.5% of Total Amount |
Within 30 months of issuance of allotment letter | 12.5% of Total Amount |
Within 36 months of issuance of allotment letter | 12.5% of Total Amount |
TO Know More Call Us @ 9711414455